Pavement Maintenance

Contact Us For A Quote

DRIVEWAY & PARKING LOT SEALCOATING

Why repave when you can seal and save! When Asphalt Maintenance and Paving arrives to seal your driveway or parking lot we’ll follow a set of procedures that guarantees long-lasting performance.

Surface Preparation

  • Trim or edge grass where needed
  • Rout cracks where applicable
  • Clean dirty areas and cracks
  • Fill cracks to make as flush as possible
  • Prep oil spots where needed
  • Apply adhesion promoter where needed

Sealcoating Process

  • Brush sealer around aprons, landscaping, sidewalks, etc.
  • Squeegee and/or spray on seal coat with high loads of sand and rubber
  • Rope off drive during the curing process (2-4 days, depending on humidity)

Pavement Maintenance

  • Past results prove that our products and procedures last 4-6 years
  • We’ll mail out maintenance reminders after three to four years
5th-in

LINE PAINTING

Oh yeah! Line painting is the essential final touch to that fresh coat of seal or all-new asphalt. Asphalt Maintenance and Paving is up to date on ADA requirements and we have a large assortment of miscellaneous stencils, letters, and numbers. For larger projects such as shopping malls and office parking lots, we have ride-on stripers to get the job done quickly and efficiently.

Line painting is like chrome detailing on a new truck. It just seals the deal. If you want the job done right, Asphalt Maintenance and Paving is the company to call

6th-in

BOTTOM LINE
With Asphalt Maintenance and Paving, Driveway Seal Coating preventative maintenance does not cost – it pays!